Please enable JavaScript to view this site.

 

 

In case that you provide a self-made event log that has not been created by the MPM EventLogGeneration Apps, MEHRWERK ProcessMining contains a clearly understandable data model with 2 template tables:

 

Event Log

Case Information

Observe minimum requirements for Process Mining (the ActivityID, the ActivityName and the ActivityTimeStamp)

Additional information that relates to an entire case

(e.g. a vendor, a factory, a material, ...)

Further information that relates exactly to ONE event


 

 

To fill the Template App with Process Mining data, adjust the table fields of the two mentioned template tables and set some variables in the following steps:

 

1.First of all, open the script editor and make sure that the tab 1B. Load EventLog is the third tab behind 0. Init and the placeholder tab "Mandatory" and that the tab 1,2,3. Data Load (with ETL) is placed behind the exit tab. The tab 3. Initiate Mining Algorithms should follow the 1B. Load EventLog tab. Your script tabs then should look like this:

 

Script tabs nov 2020

 

2.Select the data from the data connection

3.Reuse the event log template to define your event log

4.Reuse the event information and case information template to define your process related context data

5.Enable grouping

6.Define Subprocesses

7.Define when your process is completed

8.Use the factory and shift calendar template

9.Calculate the process path continuation

10.Perform conformance checking on your process data

11.Use root cause analysis on your data

12.Create translations for parts of the data model

 

Info

All table fields can be reused as master items.

 

© by MEHRWERK GmbH