This table is central for the MPM Template App as it contains the event log information and further dimensions and metrics that has been calculated by the MPM Process Mining method.

 

Extract from the pa_activity_log table:

pa_activity_log table

 

If you want to enhance the template application with visualizations and KPIs, the Qlik Sense® self-service offers you the possibility to easily create new objects in the edit mode of your app. The most important data for a process-related visualization is provided by the process log table "pa_activtiy_log" that is created by the MPM Algorithms.

To use it for your own KPIs etc., the following description of the table gives you a good overwiew:

 

Field Name

Example

Explanation

UniqueCaseActivityRow

4500774918_67290

Combination of CaseID & UniqueSortedRowNo; relevant for proper sorting. Always unique.

CaseID (Key)

4500774918

Unique Case identification (e.g. purchase order, sales order).

ActivityCounter

1

Help field for calculating the number of events that have occured

ActivityStartTimestamp

01.06.2017 00:00:00

Derived timestamp (start of activity).

ActivityEndTimestamp

01.06.2017 01:12:52

Derived timestamp (end of activity).

ActivityStartDate

01.06.2017

Derived date, key to the table MasterCalendar_Events.

ActivityType

Create Purchase Requisition

Name of event.

ActivityTypeID

1

ID of occuring event.

ActivityUserName

User

Name of resource.

ActivityGroupID

12

Group to which the Activity belongs. Can be customized in the script.

EdgeID

1-22

ID of edge between two occuring events based on ActivityTypeID.

EdgeType

Create Purchase Requisition

Send Purchase Order (PRINT)

Name of edge.

nextActivityID

22

ID of next edge.

nextActivityTimestamp

05.06.2017 17:21:51

Start timestamp of next event.

nextActivityType

Send Purchase Order (PRINT)

Name of next event.

ProcessPath

0-1-22-99999999

Sequence of the ActivityTypeIDs of the identified process - containing or not direct loops, which depends on the mwSurpressLoops variable.

ProcessPathUniqueNo

1

ID of a process path.

ProcessPathWithLoops

0-1-22-22-99999999

Sequence of the ActivityTypeIDs of the identified process - containing direct loops.

ProcessPath_RelatedDimensionKey

1_Supplier12

Key for conformance checking, to apply dimension related happy paths on the process path.

ProcessStepDuration

4 17:21:51

Calculated duration of an event (start - end).

ProcessStepPreviousIdleTime

2 12:21:32

Calculated duration of the edge before an event (waiting time until the start of the event).

ProcessStepFollowUpIdleTime

1 10:13:25

Calculated duration of the edge after an event (waiting time from the end of the event to the start of the following event).

NetProcessStepDuration

4 17:21:51

Calculated duration of an event (start - end).

NetProcessStepPreviousIdleTime

1 12:21:32

Calculated duration of the edge before an event (waiting time until the start of the event) but with subtracting the non-working-time like holidays, breaks, weekends.

NetProcessStepFollowUpIdleTime

0 10:13:25

Calculated duration of the edge after an event (waiting time from the end of the event to the start of the following event) but with subtracting the non-working-time like holidays, breaks, weekends.

OvertimeFlag

1

Shows if the work was done outside of an offical shift. 1 means overtimes were worked, 0 means, the work took place within a shift.

RealEdge

1

Indicator whether it's a virtual (start/end) edge or a real edge. 0 = Start or End.

RealNode

1

Indicator whether it's a virtual (start/end) event or a real event.. 0 = Start or End

MPM_Scenario        

P2P

If more than on MPM Scenario is loaded.

UniqueSortedRowNo

67290

Unique line ID after sorting events/edges. Not unique when delta load is used.

ParetoClassActivity

A

The field has three different values: A, B and C. These values describe the activity type by their first occurrence in process variants. A-activities are detected in A-variants. B-activities are those that can be detected in B-variants but not in A-variants. C-activities are only found in C-variants.

ActivityConformance

Correct Activity

If the activity is found in the log and in the model, this field takes the value "Correct Activity". If the activity can be found only in the log, it takes the value "Deviating Activity".

EdgeConformance

Correct Ordering

If the edge can be found in the log and in the model, this field takes the value "Correct Ordering". If the edge can only be found in the log, it takes the value "Changed Ordering".

 