Please enable JavaScript to view this site.

 

Navigation: » No topics above this level «

Release Notes

Scroll Previous Topic Top Next Topic More

 

What's new in MPM June 2022?

 

 

Webinar On Demand "What's new?"

 

Take the chance and get to know MPM June 2022 by our process mining specialists on the 30th of June 2022..

 



 

 

Info

Since March 2022, MPM releases published before 2021 have been deleted from the documentation. If you need further information, please do not hesitate to contact us.

 

Extensions

 

 

Dialog Box

improvements

Info Button shows information for the chart inside the dialog box (visualization description and measure/dimensions-description)

 

 

Lead Time Filter

improvements

Alphabetical sorting of activity list

Property panel: colors, dimensions and variables can be set by user

Limit of activities in drop down list lifted

 

Grouped container

improvements

Info Button shows information for the chart inside the grouped container (visualization description and measure/dimensions-description)

 

Process analyzer

improvements

Master item list sorted alphabetically

Start & End node browser language agnostic

Selection with/without this activity possible for a translated activity type field

 

Process Activity Filter

improvements

Selection with/without this activity possible for a translated activity type field

 

Process Variants Inspector

improvements

Default dimensions switched to Activity Type

Labeling for translated activity type field

MPM Scripts

 

 

MPM Scripts, Data Editor & Data Model

NEW

To customize the rework event definition further

oa logic to calculate repeated activities was added

othree fields were added to the data model: RepeatedEvent, ReworkAndRepeatedEvent, ReworkOrRepeatedEvent - all of them are flag fields

othe definition of the field ReworkCase depends on the chosen custom rework definition

oReuse the Event Log Template to Define Your Event Log

A new method for the guided tour configuration was added (not for customization)

New tab for the Multilang-functionality for parts of the data model: Create translations for parts of the data model

FIXes

The calculation of ABC-variants is fixed - now the first variant crossing the 80%-line is still variant A

The calculation of low automation cases and the case automation rate in the data model are fixed (the 0 and 1 were switched).

improvements

The tab "7. Process Variants Inspector" was removed for reasons of seldom use – the MPM help provides you with a how to, in case you want to color the PVI or the PA: How to specify activity colors in the data model

To add translations to the data model, nextActivity & previousActivity are kept in the small MPM data model (mvLoadLargeDataModel = 0): The pa_activity_log Table

MPM Template App

TEMPlate app

New

Rework definition now customizable with 4 options:

oReworkEvent: only events, that are marked as rework by their type directly in the eventLog are considered as rework

oRepeatedEvent: only events, that are a repeated/looped in the eventLog are considered as rework

oReworkAndRepeatedEvent: events, that are marked as rework by their type directly in the eventLog and by the same time are repeated are considered as rework

oReworkOrRepeatedEvent: events, that are marked as rework by their type directly in the eventLog or are repeated are considered as rework

A Guided Tour explaines workflows to new users or on request

Master item descriptions pop up in an info-window to describe the measures and dimensions used in the visualizations

Multilang-functionality for parts of the data model, e.g. activity types, subprocesses, happy paths and more

New Sheet. Introduction to Process Mining with exercises and the Guided Tour

Chinese translation added

IMPROVEMENTS

MPM Theme offers parameters to color the boxes on the Optimization Dashboard and the texts on the benchmarking sheets

Benchmarking Sheet: a date filter was added

Rework Sheet: a rework event filter was added

Lead Time Sheet:

oBar chart titles improved (Probability for Delay in Subprocess)

oPPI names improved (delayed cases instead of late cases)

oFilter added: Delayed Subprocesses

fixes

The Translation of several front-end elements are fixed (such as AVG/Median, period comparison options, etc.)

The button to switch between standard and resource log was corrected for a non-default resource log description

The subprocess description text was corrected on the lead time sheet

 

 

MPM Import Wizard

 

BPMN IMPORT WIZARD

NEW

The BPMN Wizard is now available for SaaS

Check of allowed filename-extensions for file-upload added

Selection of Wizard relevant apps is now possible for various filter-strings

Imporvements

Import Wizard now compatible with older browsers (< Chrome 85 & < Firefox 77)

 

 

 

MPM IMPORT WIZARD

new

The Import Wizard is now available for SaaS

New data formats are supported: import your event log as QVD from a data connection

Event log columns with MPM-ready names are auto-mapped

Check of allowed filename-extensions for file-upload added

Selection of Wizard relevant apps is now possible for various filter-strings

Improvements

Import Wizard now compatible with older browsers (< Chrome 85 & < Firefox 77)

 

 

 

 

 arrow_closeWhat's new in MPM March 2022?

 

 

 

 arrow_closeWhat's new in MPM November 2021?

 

 arrow_closeWhat's new in MPM August 2021?

 

 

arrow_closeWhat's new in MPM February 2021?

 

© by MEHRWERK GmbH